Skip to Content
Bouncie GPS Tracker for Vehicles with Real-Time Location

Price:

AU$ 278.92


Bouncie GPS Tracker for Vehicles with Real-Time Location

https://gofinchkart.com.au/web/image/product.template/143053/image_1920?unique=4e87161
  • Real-Time GPS Tracker Device for Vehicles — Ideal for personal use or fleet management, this car GPS tracker provides up-to-the-minute location updates. Our car tracking device also provides unlimited trip history, including a detailed route history
  • Driving Insights — Our OBD tracker for cars monitors speed, acceleration, hard braking, idle time, and more. This versatile family and fleet GPS tracker for cars also helps improve road safety by sending alerts in response to unsafe driving practices
  • Vehicle Health — Unlike other vehicle tracking devices, our car tracker device continuously monitors diagnostic engine data, alerting you to potential maintenance issues, so you can avoid downtime and keep fleet and family vehicles in peak condition
  • Geo-Fencing & Accident Detection — Set up geo-fences to receive notifications when your vehicle enters or exits designated areas; Equipped with advanced sensors and software, this vehicle tracker device instantly detects impacts and sends SMS alerts
  • Easy To Install & Low Monthly Subscription — Our OBD GPS tracker for vehicles plugs directly into OBD2 ports and works on most vehicles 1996 and newer; $9.65 monthly subscription required - no hidden activation or return fees - cancel anytime
  • Comprehensive Trip Recording — Track every trip with detailed information including routes, addresses, idle time, speed data, and driving patterns. Color-coded speed bands and indicator icons help visualize safe driving habits

AU$ 278.92 278.92 AUD AU$ 278.92 Tax Included

Not Available For Sale

(AU$ 278.92 / events)

  • Manufacturer
  • Unit Count
  • Specific Uses For Product
  • Brand
  • Number of Items
  • Connectivity Technology
  • Compatible Devices
  • Global Trade Identification Number
  • Special Feature
  • Item Weight
  • Country of Origin
  • Item Dimensions
  • Additional Features
  • Product Type
  • Supported Application
  • Built-In Media
  • Item Highlight
  • Enclosure Material

This combination does not exist.

Contact Us
GPS Trackers
  • Buy Two or More Offer
    Save 10% when you buy two or more items.
  • Next Purchase Offer
    Get 5% off your next purchase.
  • Delivery Offer
    Enjoy free delivery on orders above $200.
  • Orders are processed and shipped from Canberra
    Orders are processed and shipped from Canberra
Delivery Detail
Estimate delivery times: 12-26 days (International).
3-6 days (Domestic)
Safe Checkout
Guaranteed Safe Checkout
Return Policy
30-Day Return Guarantee
Confidence-backed purchases with 30-day return support.
Free Return Pickup
Free return pickup available
We’ll handle returns from your doorstep at no extra cost.
AUD
BRSWGGTRBUNGCFD6
Category
GPS, Finders & Accessories , GPS Trackers
Tags

 

Stay connected and informed about your vehicle’s location with the Bouncie GPS Tracker. This device offers comprehensive tracking and insights, providing peace of mind whether you’re monitoring a single car or managing a fleet.

Key Highlights

  • Real-Time Tracking: Receive up-to-the-minute location updates directly to your device.
  • Unlimited Trip History: Access detailed route history for every journey, allowing you to review past trips.
  • Driving Insights: Monitor key driving metrics like speed, acceleration, braking, and idle time to improve driving habits.
  • Geo-Fencing Alerts: Set up virtual boundaries and receive notifications when your vehicle enters or exits designated areas.
  • Accident Detection: Get alerted in the event of an accident, providing immediate assistance.

Useful Facts

  • Coverage: North America (US, CN, MX)
  • Data Retention: Unlimited
  • Mapping: Street & Satellite
  • Connectivity: 4G LTE Cellular
  • Power: No Battery Required

Good Fit For

  • Families wanting to monitor vehicle location.
  • Fleet managers needing vehicle tracking and management.
  • Individuals seeking to improve driving habits and safety.
  • Anyone needing to track a vehicle’s movement and location.

Product details

Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Bouncie GPS Tracker for Vehicles with Real-Time Location
Main Specification
Compatible Devices Android or Apple iOS or Desktop Browser
Special Feature No Battery Required or Coverage: North America [US, CN, MX] or Data Retention: Unlimited or Mapping Technology: Google [Street & Satellite] or Wireless Technology: 4G LTE CAT M1 See more
Manufacturer Bouncie
Unit Count 1 Count
Specific Uses For Product Vehicle tracking and monitoring
Brand Bouncie
Number of Items 1
Connectivity Technology 4G LTE Cellular
Global Trade Identification Number 00860227001514
Item Weight 1.28 Ounces
Technical Details
Country of Origin USA
Measurements
Item Dimensions 1.75 x 1.87 x 1 inches
Features & Specs
Additional Features Coverage: North America [US, CN, MX] or Data Retention: Unlimited or Mapping Technology: Google [Street & Satellite] or No Battery Required or Wireless Technology: 4G LTE CAT M1
Others
Supported Application Location Tracking or Route History or Speed Monitoring or Accident Notification or GeoFence
Item Highlight Route History or Speed Monitoring or Driving Insights or Geo-Fence or & Accident Notifications. No Contracts. Cancel Anytime.
Product Type GPS Trackers
Built-In Media OBD2 | Telematics | GPS | 4G LTE
Enclosure Material Plastic

Shipping & Delivery

At GofinchKart Australia, we aim to deliver your order quickly and safely.

Domestic Shipping (Australia):

Orders are typically delivered within 3–7 business days.

International Shipping:

Estimated delivery time is 12–26 business days, depending on the destination and customs processing.

Once your order has been dispatched, you will receive a tracking number. Delivery times may vary during public holidays or due to unforeseen delays.